THE WESLEY HOTEL

DETAILS

CLIENT: THE WESLEY HOTEL

Line drawing of a person standing on a platform or mat.

SIZE (SQ FT): 5,000

Bar graph with three ascending bars, representing data growth.

PROGRAMME PERIOD: 46 WEEKS

Calendar with a clock icon indicating scheduling or appointment date.

VALUE: £2,500,000

Outline of a basic calculator with a display screen at the top and numerical and function buttons below.

DESCRIPTION

The creation of a new mezzanine level to form an extension to an existing restaurant area. The space was to be completely stripped and fully fitted out to a more modern specification and aesthetic.

    • New restaurant and bar

    • New lift shaft and lifts

    • Extensive structural works to create the new mezzanine level and restaurant bar

    • New roof to encapsulate the space which had significant building work in connection

    • New counters, fretwork timber screens and bespoke furniture pieces

    • Undertaken whilst the hotel remained fully operational


OUR WORK ETHIC

We thoroughly believe that each project is a joint venture, we are only as capable as the sum of our parts (from design teams through to our management team and supply chain). The best way to ensure we are all able to achieve our collective goals is to work collectively, collaboratively, part of a team. This team ethic has ensured we are able to build up a client-base, a consultant-base, a subcontractor-base and a supplier-base that understands, and shares, our working principles.


WORK WITH US

If you are starting a new project or have any questions about our services and experience, please get in touch today.