KENSINGTON PARK HOTEL
DETAILS
CLIENT: AMANTE CAPITAL
SIZE (SQ FT): 30,000
PROGRAMME PERIOD: 22 WEEKS
VALUE: £2,500,00
DESCRIPTION
The Kensington Park Hotel was a scheme to rebrand the Hotel in the Marriott branding. All works were completed whilst the hotel was in full occupation and carried out on a phase-by-phase basis.
-
Strip back to bare walls 132 guest rooms, stairs and corridors and refit to the Marriott brand
Create 4 new DDA WC facilities
Strip out the reception area and remodel with new reception desk and decorative features
Strip out the existing bar, restaurant and kitchen area and re-fit with specialist joinery [bars, banquet seating, benching and various joinery features]. New decorative ceilings and M and E modification
Refit the entire back of house areas
Create a new gym at basement level including new changing room areas and staff facilities
Management of the furniture, artwork, and TV installations
Management and install of beds, furniture, table lamps etc.
OUR WORK ETHIC
We thoroughly believe that each project is a joint venture, we are only as capable as the sum of our parts (from design teams through to our management team and supply chain). The best way to ensure we are all able to achieve our collective goals is to work collectively, collaboratively, part of a team. This team ethic has ensured we are able to build up a client-base, a consultant-base, a subcontractor-base and a supplier-base that understands, and shares, our working principles.
WORK WITH US
If you are starting a new project or have any questions about our services and experience, please get in touch today.